Overview
If you have ever read the term “programmable except for the supply on/off switch” the 60-200 can provide this capability in a system with the added benefit of an easy to use LXI interface. The 60-200 is a power management switch that provides a means of remotely controlling the power status of up to 8 instruments.
Each power outlet can be programmed to switched on in sequence with a specific timing delay. The delay can be staggered to ensure that order dependent systems - like PXI - can be switched on and off in an orderly way with just one operation. A staggered start up also limits the inrush current associated with the powering up of equipment, including earth current inrush, placing less stress on cabling and leakage breakers. Power on or off instructions can be initiated from either the front panel switch or via the LXI compliant LAN interface.
Key Features
- Provides Controlled Start Up of Test Systems
- Supports Up To eight Instruments
- Settable Timing Interval and Sequence
- Permits Remote Re-booting of Systems
- Compliant to LXI Standard 1.4
- Provides Functional Stop Facility
- 3 Year Warranty
Downloads
-
PDF Datasheet
Includes full information and specifications834.53 KB -
PDF Manual
Includes manual, extended specifications, installation instructions and data1.37 MB -
Software drivers & downloads
for Switching & Simulation Productsdownloads.pickeringtest.com -
CAD models
find CAD 3D models for products heredownloads.pickeringtest.com